Skip to content
Setcoin Group
Request access
Chapter 8 of 62Space & aerospace4 min read · 2 exhibits

Vertical Integration: Why the Largest Builders Make Their Own Parts

How much of their supply chain do SpaceX, Amazon and Rocket Lab control, and what does it mean for everyone else?

Chapter summary

SpaceX builds most of its satellites' parts in its own factories, including, according to public reporting, Hall thrusters, star trackers, reaction wheels, antennas and laser terminals, and it builds about 70 satellites a week.

Key takeaways

  1. 1

    Its 2026 filings still warn that it depends on third parties for certain key components, notably semiconductors and some raw materials.

  2. 2

    Amazon integrates satellites in its own plant and buys more parts.

  3. 3

    Rocket Lab is building a merchant version of vertical integration by acquisition: solar cells, reaction wheels, star trackers, optical terminals and, if its deal closes, the Iridium network.

Key figures in this chapter

~70 a week
Starlink satellites built (Dec 2025–Feb 2026)
64.7%
of active payloads are Starlink
$189.5M
Rocket Lab Space Systems revenue, Q2 2026
~$8B
Rocket Lab–Iridium deal (pending)

Source: SpaceX filing; Setcoin space engine; Rocket Lab 8-K; reporting

Space access

Keep reading with Space access

This chapter (2 exhibits, 827 words) is part of Space & aerospace. Space access opens every chapter of all 11 Space reports, with the interactive models, Excel downloads, Ask and named Atlas records.

  • Global Market Analysis: Deep Space Economy
  • Space-Based Datacenters: Feasibility Study
  • Commercial Space Stations: Feasibility Study
  • Defence Space and Missile Defence: Golden Dome and the SDA Architecture
  • Launch After Starship: Prices, Capacity and European Sovereign Launch, 2026–2035
  • Satellites to Phones: Direct-to-Device Connectivity, Spectrum and Economics, 2026–2035
  • Space Supply Chain Bottlenecks: Components, Minerals and Capacity, 2026–2030
  • Lunar, Cislunar and Settlement Economics: What the Moon Costs and Who Pays, 2026–2060
  • Earth Observation and AI Analytics: What a Square Kilometre Is Worth and Who Captures It, 2026–2035
  • In-Space Manufacturing and Microgravity Biotech: Products, Platforms and Economics, 2026–2035
  • Space-Based Solar Power: Physics, Costs and the Path to Firm Power from Orbit, 2026–2050

€199 a month or €1,490 a year per sector, after a 7-day free trial. Cancel any time. Need several sectors? All sectors: €999 a month.

Check the live record Space Contracts & Tender Radar · Constellation Deployment Monitor · Space Claim Check (free)

Ask about this chapter

Answers drawn from every Setcoin report and the live Atlas. Each statement links to the passage behind it.

Summarise "Vertical Integration: Why the Largest Builders Make Their Own Parts" in five pointsWhich figures in this chapter matter most to an investment committee?What should I check on the Atlas after reading this?
Subscription

Ask is included with every subscription

Cited answers across every report and the Atlas, with follow-up questions and a hand-off to the opportunity finder.

Research for professional investors. Not investment advice, and not an offer of any security or fund interest.