When the orders come
By project stage: awarded projects are buying now; tendering ones within about a year; pre-tender ones in one to three years (stage-based estimate).
Open tenders that fit your equipment today, and every bankable project that will need it before it tenders.
Four in ten EU public tenders draw exactly one bid. Six agents follow the next one from first signal to first draft. You review it, and you submit it.
Single-bid share: European Court of Auditors, Special Report 28/2023, 2021 data. The tender in the film is illustrative.In Europe, four in ten public tenders draw exactly one bid. Somewhere, one of them was for the kit you make. You never saw it. So… what if you saw the next one coming? Scout has already found the next one. Fourteen months before it goes to tender. Reader goes through every page, and pulls out the requirements that decide the bid. Verifier checks the buyer. Permits, grid, funding… is this project really going ahead? Registrar gets you onto the buyer’s portal, long before the deadline. Drafter writes the first draft. You review it. You submit it. The agents never submit for you. And Watcher never stops looking. If a project stalls, you’ll know before you build for it. Same factory. Same team. This time, you saw it coming. See the tender coming.
Example run on a sample tender. Source counts are today’s. You review and submit; agents never submit for you.
Pick what you sell and where. Everything below is computed from the live Atlas — 15,421 pre-construction projects with a capex figure — through the same equipment model the paid product uses.
By project stage: awarded projects are buying now; tendering ones within about a year; pre-tender ones in one to three years (stage-based estimate).
Modeled demand for your category by the sector of the project.
Top countries and US states by modeled demand in your selection.
Move the slider to your next free production slot. Delivery = slot + your lead time; projects need delivery roughly 18 months out when awarded, 30 when tendering and 48 when pre-tender (stage-based estimate).
Regions where two or more sectors will tender your category: one framework agreement, several buyers.
Anonymised. Gates on record: P permit · G grid · O offtake · E EPC.
| Sector | Where | Size | Stage | Your category | Gates |
|---|
Vendor Intelligence names the projects behind these numbers, alerts you before each tender opens, and ranks them by bankability so your bid team works on the ones that will be built.
Modeled, not filed: demand is each project's capex times the typical share of that equipment in its sector's bill of quantities. Lead times and supply risk from Setcoin's vendor screen. Figures update as the Atlas does.
A withdrawal is public; whether equipment was already on order is not. Early signals to confirm with the developer or OEM.
20 equipment vendors and EPCs, ranked against this pipeline's modeled demand — filed backlog and capacity, not a press release. Aggregate fit only; named-project ties are the paid Vendor Intelligence product.
| Vendor | Primary category | Capacity / backlog | Atlas fit |
|---|---|---|---|
| Caterpillar (incl. Solar Turbines)US | Gas reciprocating engine gensets | Large reciprocating engine capacity going to ~3× 2024, turbines 2.5×; additions running 2–3 months ahead of plan | 34 proj. · $14bn |
| EatonIE | MV switchgear | Electrical Americas backlog +33% y/y; Electrical Global +103%; electrical book-to-bill 1.2 (rolling 12m) | 46 proj. · $22.5bn |
| VertivUS | UPS and power conversion | 15 USD bn backlog (+109% y/y), Q4 2025 book-to-bill ~2.9× | 34 proj. · $21bn |
| Siemens EnergyDE | Large-frame gas turbines | 162 EUR bn group order backlog (Gas Services EUR 73bn incl. 69 GW firm gas turbines; Grid Technologies EUR 51bn) | 4 proj. · $9.7bn |
| Schneider ElectricFR | MV switchgear | Record backlog; 2–3 years visibility via customer forecasts (H1 2026) | 46 proj. · $22.5bn |
| Applied MaterialsUS | Deposition | Fiscal Q3 2026 revenue $9.12bn (+25%); China share down to 28% | 10 proj. · $27bn |
| Trane TechnologiesIE | Chillers and heat rejection | 12.1 USD bn record backlog (+70% y/y); Americas applied bookings +130% | 46 proj. · $19.5bn |
| Lam ResearchUS | Deposition | Industry WFE ~low-$150bn in 2026, constrained by cleanroom capacity | 10 proj. · $27bn |
Procuring for a project at shovel-ready or later? Setcoin screens vendors against filed backlog and capacity, not marketing decks, and matches them to your bill of quantities.
See the Vendor subscriptionThe free account opens every feature — tenders, bid workspace, AI drafting, pipeline, alerts, readiness — so you can run a real bid end to end. Paid plans lift the limits that matter once it becomes part of how you sell.
Registry listingFrom€2k/ yearBe found by the developers and lenders Setcoin works with.Start with Registry listing | RecommendedDemand ForecastFrom€18k/ year, first categoryEvery matched project, named, with a pipeline and bid workspace to work it.Start with Demand Forecast | Tender-ReadyFrom€36k/ year per category groupIntroductions, unlimited AI drafting and help on every portal.Start with Tender-Ready | |||
|---|---|---|---|---|---|
| Tenders and bids | |||||
| Open public tenders in your categories | 3 best fits a month | All | All | All | All |
| Bids in the workspace at once | 1 | 3 | Unlimited | Unlimited | Unlimited |
| Tender documents read, facts filled in | ✓ | ✓ | ✓ | ✓ | ✓ |
| AI-drafted bid packs | 1 a year | 5 a year | 12 a year | 30 a year | Unlimited |
| Exports for Ariba, Coupa, JAGGAER | Price sheet | All formats | All formats | All formats | All formats |
| RFP Rooms you’re invited to | ✓ | ✓ | ✓ | ✓ | ✓ |
| Listed for developer invitations | — | ✓ | ✓ | ✓ | Priority |
| Demand before the tender | |||||
| Matched projects | 5, anonymised | 10, anonymised | 25, named | All, named | All, named |
| Projects in your pipeline | 3 | 10 | 50 | Unlimited | Unlimited |
| Alerts | Latest 5 | Latest 20 | All + weekly digest | All + weekly digest | All + weekly digest |
| CSV export of your matches | — | — | — | ✓ | ✓ |
| Access and team | |||||
| Readiness check, document library | ✓ | ✓ | ✓ | ✓ | ✓ |
| Introductions to procurement under NDA | — | — | — | — | ✓ |
| Help registering on tender portals | — | — | — | — | ✓ |
| Verify Snapshots included | — | — | — | — | 4 a year |
| Team seats | 1 | 2 | 3 | 5 | 10 |
Priced per equipment category. The second is 30% off, the third and later 50% off.
Prices per year in euros. Tender-Ready is per category group; several regions or groups are quoted.
No card for the free plan. You decide what to bid; nothing is submitted for you.
Vendors, OEMs & EPCs
Which projects will buy your equipment, when they are likely to tender, and where supply is tight — built from 17,828 projects on the public record, before the RFQ goes out.
Each sector's capital cost splits into known equipment shares (transformers, switchgear, turbines, storage, cooling and so on). Those shares are applied to every matching project's capex and stage, then summed by category, region and expected tender date.
The free account costs nothing and needs no card. A registry listing starts at €2k a year, the Bid plan at €6k, Demand Forecast at €18k a year for the first category, and Tender-Ready at €36k a year per category group. All prices are in euros.
Yes. A lease turns a one-off sale into years of contracted revenue and lowers the buyer’s up-front capex. The Capital Map shows when a lease lifts the project’s equity return and which equipment financiers and lessors are active in your sector.
The United States, Europe and the UK, Canada, Asia-Pacific, Latin America, and the Middle East and Africa — the same six regions as the Setcoin Atlas.