Setcoin Group
Request access
25,973 live projects · refreshed weekly

Global Infrastructure Atlas

The global pulse of critical infrastructure. Every live project worldwide — power, grid, data centres, semiconductors, hydrogen, water — every gate, one Bankability Index.

atlas · worldLive data
  • Public source systems read94
  • Cited documents252,484
  • Projects scored · 6 regions161,497
  • Live capex, modeled or filed$4.28T
  • Consented, EPC not awarded718

Pipeline by sector · share of modeled capex

Power & renewables$2.07T
48%
Data centres$1.39T
33%
Grid & transmission$526.1bn
12%
Semiconductors$210.5bn
5%
Other · 5 sectors$80.3bn
2%

Public record only. Names stay hidden until you open an account.

Sector
Stage
Consented · EPC not awarded718Permits and grid connection on record, still open to procurement · 400 with offtake filed
of filtered
3%
Pipeline CAPEX · modeled + filed$4.28Tacross 17,828 of 25,973 projects with a modeled or filed figure · whole pipeline
Pre-tenderTenderingAwardedConstr.
Trackable procurement · modeled—Equipment & materials inside that CAPEX
Rest is land, soft costs, contingency
Capacity on record1602.5 GWMW as filed in queues, permits and registers
by sector
25,973 projects in viewPublic record · anonymised

Pick a role above to open the sections built for it — regional competition, equipment demand, Bankability screening and capital-market activity each live behind one of these three views.

This is the research. The offering — what Setcoin's engines do for a sponsor, and what it costs — lives on one page.

See the Developer offering →
Your lensGrouped by region · right next to the map above

Pipeline by region

Where the pipeline is concentrated, by country — and who else is active there.

Pipeline by region: projects, consented projects, modeled CAPEX and capacity on record
RegionProjectsConsented · no EPCPipeline CAPEX (modeled)Capacity on record
Europe19,689643$1.9T1094.1 GW
United States3,06449$1.58T249.7 GW
Canada1,3650$421.4bn65.5 GW
Asia-Pacific80219$238.6bn159.1 GW
Latin America & Mexico7540$75.3bn0.6 GW
Middle East & Africa2997$58.8bn33.4 GW

Most active developers in view

Counted from the projects currently in view · entity names are gated on this public view — see below

Interconnecting entities of record

Utility or ISO member of record across the queues · whole record, not filtered · institution type hand-classified

This is the research. The offering — what Setcoin's engines do for a vendor, and what it costs — lives on one page.

See the Vendor offering →
Your lensDerived from the filtered pipeline · modeled

Equipment demand & the lead-time wall

Each project's modeled CAPEX broken into the equipment categories that sector actually buys, summed across everything currently in view. The horizon shows when an order placed today would land — a power transformer tendered this quarter is a 2031 delivery. Click any category to see which projects are behind the number.

Data-center equipment demand, probability-weighted

Pipeline model over every tracked data-center project (not just the ones in view): filed MW × stage probability × category share · modeled

This is the research. The offering — what Setcoin's engines do for a lender, and what it costs — lives on one page.

See the Capital offering →
Your lensConsent tiers · Bankability Index

Bankability screen

Projects sorted by how far their consents have travelled on the public record. Tier 1 is the shared target for pre-EPC lenders and equipment vendors alike; tier 4 (EPC awarded) is where construction and term-debt lenders look instead. The index measures what the public record proves — consents, grid position, filed offtake — not a credit opinion.

Momentum · from the filings themselves

What actually moved in the last 90 and 180 days.

The pipeline above is what's coming. This is what crossed a milestone recently — interconnection agreements signed, studies approved, construction started, energisation approved — counted from the queue filings, not from press releases.

Milestones crossed, 90 vs 180 days

Counted from ISO interconnection queue status changes · capacity as filed
Capital markets · from the filings themselves

Raising capital now.

SEC Form D private-placement notices matching data-center terms, latest filing per issuer with amount remaining — issuer level only, no person-level data.

Issuer names are gatedThese are real open raises — request access to see who's raising.
Open raises on the record

Interconnection · from the queues themselves

Who is interconnecting, by institution type.

Interconnecting utility of record across the queues, classified by institution type — the counterparties you're negotiating grid position against.

From the Capital Map · 183 groups profiled

Who funds projects before they are built.

183 capital groups that fund projects from development to construction — matched to 660 Atlas projects at shovel-ready or later. Names withheld; strategy, stages and ticket size shown.

See all 183 groups →
#GroupEarly stagesRegionsTicketAtlas fit
1Global alternatives manager — infrastructure & renewablesLarge-cap infra equityDevelopment · Shovel-ready · Bankable · FID-readyGlobal$250m–$5bn652 proj.
2Global infrastructure manager — greenfield platformsLarge-cap infra equityDevelopment · Shovel-ready · Bankable · FID-readyGlobal$150m–$3bn652 proj.
3Power-equipment manufacturer finance armVendor finance (OEM)Development · Shovel-ready · Bankable · FID-readyGlobal$20m–$300m649 proj.
4Mid-market infrastructure manager — greenfield & value-addMid-market infra equityDevelopment · Shovel-ready · Bankable · FID-readyEU · UK · US$25m–$500m635 proj.
66Mid-market infrastructure manager — energy and digitalMid-market infra equityShovel-ready · Bankable · FID-readyUK · EU · US · APAC$25m–$400m635 proj.
67Clean-energy infrastructure managerClean-energy infra equityShovel-ready · Bankable · FID-readyEU · US · APAC$50m–$700m632 proj.
5Mid-market energy-infrastructure managerMid-market infraDevelopment · Shovel-ready · Bankable · FID-readyUK · EU · IT$10m–$200m624 proj.
6Impact manager — energy-transition fundsEnergy-transition managerDevelopment · Shovel-ready · Bankable · FID-readyEU · CEE · IT$20m–$300m624 proj.

Sponsoring a project at shovel-ready or later? Setcoin screens projects against the same gate standard these groups apply, and says which of them fit, before anything is sent.

Request a capital match
Verified pipeline · as of 2026-09-26

Top 10 pre-FID projects by sector

52 projects of $150m+ capex at shovel-ready, bankability or FID stage, each checked against public registers and dated sources. Anonymised: region, stage and evidence only.

Request the named list
#LocationWorking stageEst. CAPEXGates on public evidenceRequired capital (est.)Verified by
1United States · TexasFID$20.0bnest.LandConsentPermitsGridOfftakeEPCSponsorCapitalSponsor-fundedDD screen + counterparty check
2United States · KentuckyFID$10.0bnsponsorLandConsentPermitsGridOfftakeEPCSponsorCapital$10.0bnDD screen + counterparty check
3United States · VirginiaFID$3.0bnsponsorLandConsentPermitsGridOfftakeEPCSponsorCapitalSponsor-fundedDD screen + counterparty check
4United States · TexasFID$17.0bnsponsorLandConsentPermitsGridOfftakeEPCSponsorCapital$12.8bnDD screen + counterparty check
5United KingdomFID$3.2bnest.LandConsentPermitsGridOfftakeEPCSponsorCapitalSponsor-fundedDD screen + counterparty check
6United States · PennsylvaniaFID$6.0bnsponsorLandConsentPermitsGridOfftakeEPCSponsorCapital$6.0bnDD screen + counterparty check
7United States · LouisianaFID$6.0bnsponsorLandConsentPermitsGridOfftakeEPCSponsorCapitalSponsor-fundedDD screen + counterparty check
8United KingdomBankability$5.2bnsponsorLandConsentPermitsGridOfftakeEPCSponsorCapital$5.2bnDD screen + counterparty check
9United KingdomBankability$13.4bnsponsorLandConsentPermitsGridOfftakeEPCSponsorCapital$13.4bnDD screen + counterparty check
10United States · New YorkBankability$3.6bnest.LandConsentPermitsGridOfftakeEPCSponsorCapital$3.6bnDD screen + counterparty check

Observed a register or filing proves it ·Partial a sponsor statement or an incomplete record ·Not observed ·Not required. Required capital = estimated capex less capital evidenced as committed (closed debt, approved grants, disclosed committed equity); "Sponsor-funded" where the owner builds for its own use from its balance sheet. Capex marked "est." is modelled from capacity where no figure is published.

How the Atlas is built · part of the Setcoin Infrastructure OS

Public registers in. A scored, anonymised map out.

94 public source systems feed one record. Setcoin reconciles it, scores every project on the Bankability Index and publishes it here — the same file the vendor, capital and developer workspaces open.

Public registersInterconnection queuesPlanning & permitsProcurement noticesAward registersCompany registers
Setcoin enginesReconciliationBankability IndexKnowledge graph
This AtlasProject mapBankability screenEquipment demandRegional pipeline
WorkspacesVendors & EPCsLenders & capitalDevelopersVerify
monitor · example runLive counts
  • Reading 94 public source systems
  • Interconnection queues, permits, procurement notices, awards
  • 252,484 cited documents on the record
  • Refreshed with the weekly pipeline run
94public source systems

The steps are the pipeline’s real stages; the counts are this page’s live ones.

Frequently asked

Everything worth knowing about the map.

Straight answers — sourced from this page, not marketing copy.

01What is Setcoin Atlas?
A live map of infrastructure development read from the public record — interconnection queues, permits, procurement notices and award registers — scored with a Bankability Index. Nothing is licensed third-party data; every figure traces to a citable public document.
02Is Setcoin Atlas free to use?
Yes. The map, filters, Bankability screen and equipment views are free with no account. Developer, sponsor and citation-source detail on individual records is available to registered accounts.
03How many infrastructure projects does Setcoin Atlas track in World?
161,497 projects have been scored in World from the public record; 25,973 are currently pre-construction or in construction and shown on the live map.
04What is the Bankability Index?
A 0–100 score built only from the four consent gates shown on each record — not a credit opinion, and not a separate hidden number. Permits and grid connection are worth 35 points each; filed offtake and EPC award are worth 15 points each (offtake is weighted lower because it's the least public gate — PPAs are usually private). Tier 1 (permits and grid on record, EPC still open) scores 85 and is the primary target for both lenders structuring pre-EPC finance and vendors bidding the tender.
05Which sectors does Setcoin Atlas cover?
Data centres, Power & renewables, Grid & transmission, Semiconductors, Hydrogen & ammonia, Renewable fuels & SAF, CO₂ storage (Class VI), Transmission, Water, Advanced manufacturing.
06Which regions does Setcoin Atlas cover?
Six live regions today, built from the same public-record pipeline and gate model: United States, Europe, Canada, Latin America & Mexico, Middle East & Africa, Asia-Pacific.
07How is the data sourced?
Every project is read from public filings — interconnection queues, permits, procurement notices and award registers — never licensed third-party data. The Atlas reads 94 public source systems. Public filings are the starting point; Setcoin's proprietary reconciliation engines resolve each project, company and counterparty across registers, our own algorithms score it, and a knowledge graph that compounds with every screen and diligence file adds context no single register holds.
08What is an interconnection queue?
The public list an ISO or utility keeps of every generation, storage or large-load project waiting for a grid connection study and agreement. It's one of the earliest reliable public signals that a project is real, which is why Atlas reads these queues directly rather than press releases.
09How often is the map updated?
The snapshot refreshes with the weekly pipeline run; source and citation counts are pulled from the current registry.
10Is the Bankability Index investment advice?
No. The Bankability Index scores what a project shows on the public record — its four consent gates — so lenders, sponsors and vendors read the same project the same way. It is not a credit opinion or a recommendation.
11Are project and developer names shown publicly?
No. The public map aggregates every project to sector, stage and location only. Developer, sponsor and citation-source identity is available to registered accounts.
12Can I access Setcoin Atlas data by API?
Yes, for registered accounts. The equipment, capital-markets and regional intelligence modules ship with scheduled export or API access, priced per module or as a fixed annual fee.