Skip to content
Setcoin Group
Request access
Chapter 7 of 62Space & aerospace4 min read · 1 exhibits

How the Bottlenecks Formed: a Timeline, 2018–2026

How did the space supply chain move from craft production to bottlenecks in eight years?

Chapter summary

in three phases.

Key takeaways

  1. 1

    From 2018 to 2021, constellations turned satellites into a volume product and the largest builders brought parts in-house.

  2. 2

    From 2022 to 2024, war in Ukraine, the post-pandemic electronics shortage and the start of proliferated defence architectures created the first visible shortages, of xenon, chips, solid motors and optical terminals, while China began licensing gallium and germanium exports.

  3. 3

    From 2025 to 2026, defence demand surged with Golden Dome, mineral controls turned into a ban and a suspension, grid and data-centre construction absorbed shared electrical capacity, and consolidation accelerated.

Space access

Keep reading with Space access

This chapter (1 exhibits, 814 words) is part of Space & aerospace. Space access opens every chapter of all 11 Space reports, with the interactive models, Excel downloads, Ask and named Atlas records.

  • Global Market Analysis: Deep Space Economy
  • Space-Based Datacenters: Feasibility Study
  • Commercial Space Stations: Feasibility Study
  • Defence Space and Missile Defence: Golden Dome and the SDA Architecture
  • Launch After Starship: Prices, Capacity and European Sovereign Launch, 2026–2035
  • Satellites to Phones: Direct-to-Device Connectivity, Spectrum and Economics, 2026–2035
  • Space Supply Chain Bottlenecks: Components, Minerals and Capacity, 2026–2030
  • Lunar, Cislunar and Settlement Economics: What the Moon Costs and Who Pays, 2026–2060
  • Earth Observation and AI Analytics: What a Square Kilometre Is Worth and Who Captures It, 2026–2035
  • In-Space Manufacturing and Microgravity Biotech: Products, Platforms and Economics, 2026–2035
  • Space-Based Solar Power: Physics, Costs and the Path to Firm Power from Orbit, 2026–2050

€199 a month or €1,490 a year per sector, after a 7-day free trial. Cancel any time. Need several sectors? All sectors: €999 a month.

Check the live record Space Contracts & Tender Radar · Constellation Deployment Monitor · Space Claim Check (free)

Ask about this chapter

Answers drawn from every Setcoin report and the live Atlas. Each statement links to the passage behind it.

Summarise "How the Bottlenecks Formed: a Timeline, 2018–2026" in five pointsWhich figures in this chapter matter most to an investment committee?What should I check on the Atlas after reading this?
Subscription

Ask is included with every subscription

Cited answers across every report and the Atlas, with follow-up questions and a hand-off to the opportunity finder.

Research for professional investors. Not investment advice, and not an offer of any security or fund interest.