Three Plants: Pilot, Commercial and Mature

How would a pilot plant, a first commercial plant and a mature plant differ in size, cost and output?

Chapter summary

by orders of magnitude in cost per unit of power.

Key takeaways

  1. 1

    Setcoin's illustrative pilot plant of 100 MW, with first-of-a-kind hardware at $20/W and launch at $1,000/kg, would weigh about 1,000 tonnes, need about 10 launches, cost about $4.5 billion and produce electricity at about $592/MWh.

  2. 2

    The 2 GW reference plant, at $2/W hardware, would cost about $54.6 billion and produce at about $357/MWh.

  3. 3

    A mature plant of 2 GW at 5 kg/kW, $200/kg launch and $1/W hardware would cost about $7.6 billion and produce at about $50/MWh.

Space access

Keep reading with Space access

This chapter (322 words) is part of Space & aerospace. Space access opens every chapter of all 11 Space reports, with the interactive models, Excel downloads, Ask and named Atlas records.

  • Global Market Analysis: Deep Space Economy
  • Space-Based Datacenters: Feasibility Study
  • Commercial Space Stations: Feasibility Study
  • Defence Space and Missile Defence: Golden Dome and the SDA Architecture
  • Launch After Starship: Prices, Capacity and European Sovereign Launch, 2026–2035
  • Satellites to Phones: Direct-to-Device Connectivity, Spectrum and Economics, 2026–2035
  • Space Supply Chain Bottlenecks: Components, Minerals and Capacity, 2026–2030
  • Lunar, Cislunar and Settlement Economics: What the Moon Costs and Who Pays, 2026–2060
  • Earth Observation and AI Analytics: What a Square Kilometre Is Worth and Who Captures It, 2026–2035
  • In-Space Manufacturing and Microgravity Biotech: Products, Platforms and Economics, 2026–2035
  • Space-Based Solar Power: Physics, Costs and the Path to Firm Power from Orbit, 2026–2050

€199 a month or €1,490 a year per sector, after a 7-day free trial. Cancel any time. Need several sectors? All sectors: €999 a month.

Check the live record Space Contracts & Tender Radar · Space Claim Check (free)

Ask about this chapter

Answers drawn from every Setcoin report and the live Atlas. Each statement links to the passage behind it.

Summarise "Three Plants: Pilot, Commercial and Mature" in five pointsWhich figures in this chapter matter most to an investment committee?What should I check on the Atlas after reading this?
Subscription

Ask is included with every subscription

Cited answers across every report and the Atlas, with follow-up questions and a hand-off to the opportunity finder.

Research for professional investors. Not investment advice, and not an offer of any security or fund interest.