about a dozen.

Key takeaways

  1. 1

    Sunlight above the atmosphere carries about 1,361 W/m².

  2. 2

    A collector in geostationary orbit is lit about 99% of the year, against about 20–25% capacity for good ground solar.

  3. 3

    The chain from sunlight to grid keeps about 18% of collected energy with microwaves and about 5.5% with lasers in Setcoin's reference.

The chapter · 383 words · 0 exhibits

Which numbers should a reader keep in mind when judging any claim about space solar power?

The short answer. about a dozen. Sunlight above the atmosphere carries about 1,361 W/m². A collector in geostationary orbit is lit about 99% of the year, against about 20–25% capacity for good ground solar. The chain from sunlight to grid keeps about 18% of collected energy with microwaves and about 5.5% with lasers in Setcoin's reference. A 1 km transmitter at 5.8 GHz makes a spot about 4.5 km across from geostationary orbit. At 10 kg/kW, a 2 GW plant weighs about 20,000 tonnes and needs about 200 launches of 100 tonnes. At $1,000/kg to low orbit, launch makes up 92% of capital cost and electricity costs about $357/MWh; at $200/kg it is about $95/MWh. Firm power on Earth costs roughly $48–251/MWh, depending on technology. The table collects these numbers with the chapters that explain them.

The numbers

QuantityValueChapter
Sunlight above the atmosphere~1,361 W/m²9
Time in sunlight, GEO~99% of the year9
Capacity factor assumed for SBSP95%53
Microwave chain efficiency, sunlight to grid~18%27
Laser chain efficiency, sunlight to grid~5.5%29
Spot diameter from GEO, 5.8 GHz, 1 km transmitter~4.5 km25
Spot diameter from GEO, 2.45 GHz, 1 km transmitter~10.7 km25
Average intensity, 2 GW over 4.5 km~125 W/m²25
Public exposure guidance (summarised)~10 W/m²35
Mass of a 2 GW plant at 10 kg/kW~20,000 t43
Launches at 100 t each~20043
Capital cost, reference case~$27.3/W (~$54.6 billion for 2 GW)53
Launch share of capital, reference case~92%53
Cost of electricity, reference case~$357/MWh53
Cost of electricity at $200/kg launch~$95/MWh53
Annual output of 2 GW at 95%~16.6 TWh5
Firm power on Earth (Lazard 2025 ranges)~$48–251/MWh57
Rectenna land, 2 GW~25–40 km²33

How to use them

When a developer or report quotes a cost of electricity, check four inputs against these numbers: mass per kilowatt, launch price, hardware cost per watt and cost of capital. Most published differences come from these four (Chapter 55).

What would change this view

These numbers are Setcoin's reference values as of October 2026. Measured results from orbital demonstrations would replace several of them.

Check the live record Space Contracts & Tender Radar · Space Claim Check (free)

Ask about this chapter

Answers drawn from every Setcoin report and the live Atlas. Each statement links to the passage behind it.

Summarise "Key Numbers at a Glance" in five pointsWhich figures in this chapter matter most to an investment committee?What should I check on the Atlas after reading this?
Subscription

Ask is included with every subscription

Cited answers across every report and the Atlas, with follow-up questions and a hand-off to the opportunity finder.

Research for professional investors. Not investment advice, and not an offer of any security or fund interest.