Chapter summary

not entirely, and not quickly.

Key takeaways

  1. 1

    The EU defines "non-dependence" as free, unrestricted access to any required space technology and has funded critical space technologies with about €20 million a year since 2023, a small sum against the need.

  2. 2

    Its 2026 programme targets space-critical EEE parts, including a radiation-hard FPGA on 7 nm technology and GaN MMIC substrates.

  3. 3

    IRIS², expanded to 348 satellites in August 2026 with services from 2029, is the test: Aerospacelab is to build 264 platforms (€2.4 billion), Airbus the remaining low-orbit platforms with Thales Alenia Space payloads, and OHB 18 medium-orbit platforms, but some critical parts still come only from outside Europe, and only €2.4 billion of public money was firmly committed at the time of the August agreement.

Key figures in this chapter

348
IRIS² satellites (Aug 2026)
264
platforms from Aerospacelab (€2.4B)
~€20M
EU non-dependence funding a year
2029
IRIS² services start

Source: EUSPA; European Spaceflight; European Commission

Space access

Keep reading with Space access

This chapter (1 exhibits, 739 words) is part of Space & aerospace. Space access opens every chapter of all 11 Space reports, with the interactive models, Excel downloads, Ask and named Atlas records.

  • Global Market Analysis: Deep Space Economy
  • Space-Based Datacenters: Feasibility Study
  • Commercial Space Stations: Feasibility Study
  • Defence Space and Missile Defence: Golden Dome and the SDA Architecture
  • Launch After Starship: Prices, Capacity and European Sovereign Launch, 2026–2035
  • Satellites to Phones: Direct-to-Device Connectivity, Spectrum and Economics, 2026–2035
  • Space Supply Chain Bottlenecks: Components, Minerals and Capacity, 2026–2030
  • Lunar, Cislunar and Settlement Economics: What the Moon Costs and Who Pays, 2026–2060
  • Earth Observation and AI Analytics: What a Square Kilometre Is Worth and Who Captures It, 2026–2035
  • In-Space Manufacturing and Microgravity Biotech: Products, Platforms and Economics, 2026–2035
  • Space-Based Solar Power: Physics, Costs and the Path to Firm Power from Orbit, 2026–2050

€199 a month or €1,490 a year per sector, after a 7-day free trial. Cancel any time. Need several sectors? All sectors: €999 a month.

Check the live record Space Contracts & Tender Radar · Constellation Deployment Monitor · Space Claim Check (free)

Ask about this chapter

Answers drawn from every Setcoin report and the live Atlas. Each statement links to the passage behind it.

Summarise "Europe: Non-Dependence, IRIS² and the Supply Base" in five pointsWhich figures in this chapter matter most to an investment committee?What should I check on the Atlas after reading this?
Subscription

Ask is included with every subscription

Cited answers across every report and the Atlas, with follow-up questions and a hand-off to the opportunity finder.

Research for professional investors. Not investment advice, and not an offer of any security or fund interest.