The global pulse, in seven charts.
What the public record says once six regions sit in one schema. One takeaway per chart; the numbers are one click away.
Consented and connected, not yet tendered
718 projects have permits and a grid connection with the EPC still open — Europe leads with 643.
By region · projects
Where they cluster · projects
The data-centre load wave
90.9 GW of data-centre load is filed in grid queues — Texas alone carries 24.5 GW.
Filed load by state or province
Filed load by region
How long a US queue position takes
Projects that make it in CAISO take a median 70 months to switch on; in NYISO, the ones that fail drop out in 6.9.
Months to commercial operationMonths to withdrawal
What Britain pays for offtake
Every UK Contract for Difference is public — pick a technology to see its strike price move round by round.
Where EU public money lands
Poland receives the most EU project funding on active infrastructure — $12.7bn across 500 projects.
The transformer wall
The active pipeline needs about $359bn of power transformers — a category with 48–66 month lead times everywhere.
Where new industries meet the grid
706 places host an emerging-sector site — a fab, a refinery, a biotech campus — inside an active power pipeline.