Skip to content
Setcoin Group
Request access
Chapter 4 of 15Space & aerospace16 min read · 11 exhibits

Critical Infrastructure Bottlenecks & Investment Opportunities

Where exactly does infrastructure constrain growth, and how large is each gap?

Chapter summary

This is the memorandum's central chapter. A $626B economy on track for $1.8T by 2035 is limited by six pieces of infrastructure. Each is rated by severity, from an active economic constraint to missing infrastructure that prevents new markets from forming.

Key takeaways

  1. 1

    Ground stations: 400 serve 14,300+ active payloads, with 300% oversubscription expected by 2030.

  2. 2

    Xenon for electric propulsion: global output is about 40–60 tonnes a year, and prices spiked 300% in 2022–23.

  3. 3

    Rad-hard electronics grow 5.76% a year, against satellite production growth of 15–25%.

Space access

Keep reading with Space access

This chapter (11 exhibits, 3,725 words) is part of Space & aerospace. Space access opens every chapter of all 11 Space reports, with the interactive models, Excel downloads, Ask and named Atlas records.

  • Global Market Analysis: Deep Space Economy
  • Space-Based Datacenters: Feasibility Study
  • Commercial Space Stations: Feasibility Study
  • Defence Space and Missile Defence: Golden Dome and the SDA Architecture
  • Launch After Starship: Prices, Capacity and European Sovereign Launch, 2026–2035
  • Satellites to Phones: Direct-to-Device Connectivity, Spectrum and Economics, 2026–2035
  • Space Supply Chain Bottlenecks: Components, Minerals and Capacity, 2026–2030
  • Lunar, Cislunar and Settlement Economics: What the Moon Costs and Who Pays, 2026–2060
  • Earth Observation and AI Analytics: What a Square Kilometre Is Worth and Who Captures It, 2026–2035
  • In-Space Manufacturing and Microgravity Biotech: Products, Platforms and Economics, 2026–2035
  • Space-Based Solar Power: Physics, Costs and the Path to Firm Power from Orbit, 2026–2050

€199 a month or €1,490 a year per sector, after a 7-day free trial. Cancel any time. Need several sectors? All sectors: €999 a month.

Check the live record Space Claim Check · Constellation Deployment Monitor · Space Contracts & Tender Radar (free)

Ask about this chapter

Answers drawn from every Setcoin report and the live Atlas. Each statement links to the passage behind it.

Summarise "Critical Infrastructure Bottlenecks & Investment Opportunities" in five pointsWhich figures in this chapter matter most to an investment committee?What should I check on the Atlas after reading this?
Subscription

Ask is included with every subscription

Cited answers across every report and the Atlas, with follow-up questions and a hand-off to the opportunity finder.

Research for professional investors. Not investment advice, and not an offer of any security or fund interest.