Skip to content
Setcoin Group
Request access
Chapter 56 of 62Space & aerospace3 min read · 1 exhibits

Risk Register

What could go wrong in the space supply chain between 2026 and 2030, how likely is it and how much would it matter?

Chapter summary

Setcoin lists eighteen risks.

Key takeaways

  1. 1

    The highest-scoring combine likelihood and impact: a lapse or tightening of China's mineral export controls after 27 November 2026, continued shortfalls of merchant optical terminals, solid motor capacity absorbed by missile demand, and launch delays for constellations without their own rockets.

  2. 2

    Several low-likelihood risks have very high impact, notably the loss of a rad-hard foundry line and a conflict that destroys satellites faster than the chain can replace them.

Space access

Keep reading with Space access

This chapter (1 exhibits, 695 words) is part of Space & aerospace. Space access opens every chapter of all 12 Space reports, with the interactive models, Excel downloads, Ask and named Atlas records.

  • Global Market Analysis: Deep Space Economy
  • Space-Based Datacenters: Feasibility Study
  • Commercial Space Stations: Feasibility Study
  • Defence Space and Missile Defence: Golden Dome and the SDA Architecture
  • Launch After Starship: Prices, Capacity and European Sovereign Launch, 2026–2035
  • Satellites to Phones: Direct-to-Device Connectivity, Spectrum and Economics, 2026–2035
  • Space Supply Chain Bottlenecks: Components, Minerals and Capacity, 2026–2030
  • Lunar, Cislunar and Settlement Economics: What the Moon Costs and Who Pays, 2026–2060
  • Earth Observation and AI Analytics: What a Square Kilometre Is Worth and Who Captures It, 2026–2035
  • In-Space Manufacturing and Microgravity Biotech: Products, Platforms and Economics, 2026–2035
  • Space-Based Solar Power: Physics, Costs and the Path to Firm Power from Orbit, 2026–2050
  • Orbital Risk: Space Insurance, Debris Liability and Traffic Management, 2026–2035

€199 a month or €1,490 a year per sector, after a 7-day free trial. Cancel any time. Need several sectors? All sectors: €999 a month.

Check the live record Space Contracts & Tender Radar · Constellation Deployment Monitor · Space Claim Check (free)

Ask about this chapter

Answers drawn from every Setcoin report and the live Atlas. Each statement links to the passage behind it.

Summarise "Risk Register" in five pointsWhich figures in this chapter matter most to an investment committee?What should I check on the Atlas after reading this?
Subscription

Ask is included with every subscription

Cited answers across every report and the Atlas, with follow-up questions and a hand-off to the opportunity finder.

Research for professional investors. Not investment advice, and not an offer of any security or fund interest.